Beacon Basingstoke Roofing

Commercial roofing in Basingstoke

We repair, overlay and replace the roofs on business premises around Basingstoke: warehouses, industrial units, offices, shops and workshops. The free survey comes with photographs of your premises roof and a fixed written quote after it. Where a repair will hold, we say so, and laps, rooflights, outlets and gutters are checked on the same visit.

An industrial unit with a metal profiled sheet roof and rooflights on a Basingstoke business park

Three kinds of business roof we work on

  • Roofers with edge protection replacing sheeting on a warehouse roof

    Industrial sheeted roofs

    Profiled metal sheets or composite panels fixed to steel purlins, the horizontal beams that carry the roof. We reseal laps, replace corroded sheets and fit new rooflights on warehouses and factory units.

  • Dark grey flat roof on a house extension

    Single-ply and felt flat roofs

    Flat roofs on shops, offices and units, covered in a single-ply membrane or layers of built-up felt. We repair splits and failed outlets, or strip and relay with new insulation beneath.

  • Flat roof re-laid in EPDM rubber membrane

    Overcladding old roofs

    A new weathertight sheet system fixed over an ageing roof, so the building keeps working while the old covering stays put. It is often the sensible answer for asbestos cement sheets and tired steel.

Signs your commercial roof needs looking at

  • Drips or stained ceiling tiles that reappear after every heavy shower
  • Orange rust blooming along the cut edges and fixings of metal sheets
  • Buckets, tarpaulins or sheeting already placed to catch the water
  • Daylight showing at sheet laps, ridge or around a rooflight
  • Standing water on the flat roof long after the rain has gone

Commercial roof work from survey to sign-off

  1. 1Survey of the roof and drainageWe inspect the roof from a safe working position, check the drainage and look inside the building too.
  2. 2Photographs and fixed priceYou receive pictures of the defects with the cause of each, and a fixed written price for the works.
  3. 3Plan, protect and reroofWe agree access, edge protection and working hours with you, then repair, overclad or replace the covering.
  4. 4HandoverWe check laps, outlets and rooflight kerbs, and hand over photographs and covering details for your building file.

The commercial roof long read

Warehouse, unit and shop roof faults around Basingstoke, and how each is repaired or replaced

A business roof is judged differently from a house roof. It is large, it is often hard to reach, and when it leaks it can stop stock, machinery or a till. Most of the units on the industrial estates around Basingstoke and the towns near it carry one of two coverings: profiled metal or composite sheets fixed to steel purlins, or a flat roof in single-ply membrane or built-up felt. Each fails in its own recognisable ways. Below, each fault is matched to its fix, covering sheet laps, corrosion, asbestos cement, rooflights, flat roof seams and outlets, box gutters, and keeping a business running while the work goes on. Houses and extensions with flat roofs are on our flat roofing page, and this page is for business premises only.

Chapter 1: Why does my warehouse roof drip along the same lines every time it rains?

What we find

A sheeted roof is made of long profiled panels laid side by side and overlapping at the edges. Each overlap is called a lap, and each lap should be sealed with a strip of mastic, a soft sealant that stays elastic, so that wind-driven rain cannot be pushed up between the sheets. Along the length of the roof the sheets are held down by fixings, screws with a washer under the head, driven through the crown of the profile into the purlin below.

The drip lines you see inside tend to follow one of two patterns. Water that runs in a straight line down the fall of the roof is almost always a lap that has opened. The mastic has dried and shrunk, or the sheets have moved with the heat of the day and pulled the seal apart. Water that appears in spots along a purlin points to fixings. A screw that was driven too tight crushes its washer, one driven at a slant never seats, and over many winters the holes elongate as the roof flexes in the wind. We also find sheets that were laid with too short an overlap on a shallow pitch, which no amount of sealant will cure. Because the water travels along the underside of the sheet before it drops, the stain on the floor is often several metres from the real entry point.

What we fix

We start with the lap and the fixings, because they are the cheapest places to be wrong. A repair might mean lifting the top sheet along the lap, cleaning both faces, laying fresh sealant tape and refixing with new screws and washers set to the right tension. Elongated holes get a larger fixing or an oversized washer. Where a ridge or a verge has lost its seal, the same approach applies at the junction. Our guide to industrial roof sheeting, profiles and fixings explains how the profiles and fasteners differ.

If the pitch is too shallow for the overlap, resealing only buys a season. The proper answer is either a longer-lap sheet, a single-length sheet running eaves to ridge, or a different system altogether. Composite panels, which are a factory-made sandwich of two steel skins around an insulating core, remove the lap problem on the long dimension, though their joints still need sealing.

Each fix is photographed before and after, so you can see the lap or fixing we replaced. If the sheets are otherwise sound and the leaks are limited to a few runs, a targeted repair will carry the roof for years and we will price it that way. If the sheets are rusting through, the next chapter applies.

Before: Slipped and cracked clay roof tilesBefore
After: Clay tiled pitched roof gable on a red-brick houseAfter
Typical of what we find and what we leave behind. Every survey includes photos of your own roof.

Chapter 2: Why are the edges and fixings of my metal roof turning orange, and does it mean new sheets?

What we find

Steel roof sheets are coated to protect them. Most carry a layer of zinc over the steel and a paint-type finish above that, often a plastisol, a thick PVC-based coating. That coating covers the face of the sheet well. It does not cover the edge where the sheet was cut to length, and a cut edge exposes bare steel and zinc to damp air. Rust starts there and creeps in underneath the paint, lifting it as a blister. This is cut edge corrosion, and it is one of the most common faults on older sheeted units.

It shows up first at the eaves, where cut ends sit in the gutter and stay wet, along the laps, where water is held by capillary action between two sheets, and around penetrations such as flue pipes and vents. Fixings rust too, and a rusted screw loses its grip on the purlin. Gutters that hold standing water can rot their way through the lower few centimetres of every sheet that overhangs them. Another cause is a sheet that has been scratched during fitting, or walked on with grit under the boots, which breaks the coating on the face and starts the same process from the top. Left alone, corrosion spreads along the sheet until the metal thins and holes appear. A sheet with a few orange edges is a maintenance job. One with holes through the profile is past that point.

What we fix

The fix depends on how far the rust has gone, and we check by looking and by probing with a screwdriver. Surface corrosion at the edges can be treated: we wire-brush back to sound metal, apply a rust converter and a primer, and paint on a compatible finish, then seal the laps. That halts the spread, and it is far cheaper than new sheets. Our guide to cut edge corrosion on metal roofs explains the causes and the treatment in detail.

Where the steel has gone through, individual sheets are replaced. We match the profile, thickness and coating, fit new fixings and reseal the laps. Where a large part of the roof is affected, the choice becomes whether to replace sheets run by run or overclad the roof, covered in a later chapter. An overlay system that lets you keep trading usually wins on a big roof, because it avoids opening the building.

Gutters matter as much as sheets. If standing water in a gutter caused the damage, new sheets fitted over the same gutter fail again, so we clear it, reset the fall and, if it has rotted, line or replace it. The meter shows where a typical corroded sheet roof sits between treatment and replacement.

Chapter 3: What are my options for an old asbestos cement roof on a unit or garage block?

What we find

Many business buildings put up between the 1950s and the 1990s around Basingstoke were roofed with corrugated sheets of asbestos cement, usually shortened to AC. The sheets are grey, often mossy, and brittle with age. Left intact and undisturbed, cement-bound asbestos is a lower risk than the loose fibre that people fear, but it is still a hazard when it is broken, drilled or scrubbed. If you own, manage or maintain a non-domestic building, the Control of Asbestos Regulations 2012 place a duty to manage asbestos on you: you need to know whether it is there, what condition it is in, and have a plan for it.

The roof tells its own story. Sheets crack where they have been walked on, and lichen holds moisture against the surface and slowly breaks the cement down. Fixings rust, so sheets lift in the wind. Rooflights set into the AC are often glass-reinforced plastic that has gone brittle. A common mistake is to pressure wash a moss-covered AC roof, which blasts the surface off the sheets and spreads fibre across the site and into the drains. Another is for an unprepared tradesperson to walk across it to reach a fault, and step through a sheet.

What we fix

The right route depends on the sheets, the building and your plans. The options are to leave and monitor the roof, to overclad it, or to remove it. Overcladding means fitting a new sheet system over the old one, so the asbestos stays in place and sealed. The HSE's guidance on small asbestos cement structures treats overlaying as a legitimate alternative to removal, and it is often the least disruptive option on a working site. Our answer on whether you can overclad an asbestos cement roof covers the checks. The new roof has to be fixed without drilling through the old sheets more than the fixing method requires, and the old sheets need to be strong enough to take the load.

Removal is non-licensed work under HSE rules when the sheets are handled carefully and not broken up, but it still needs a risk assessment, controls and trained workers. It becomes notifiable non-licensed work if the material will be substantially broken up, for example by dropping the roof, and the notification goes to the enforcing authority first. If other asbestos materials turn up, such as insulating board in a soffit or a lining, the job stops and gets reassessed. Our guide to asbestos cement roofs on commercial buildings sets out the duty to manage and the options. The HSE page on non-licensed asbestos work explains the categories.

Before: Crumbling mortar under a clay ridge tileBefore
After: House roof stripped to battens during a roof replacementAfter
Typical of what we find and what we leave behind. Every survey includes photos of your own roof.

Chapter 4: Why do the rooflights on my industrial unit leak, and are they safe to walk on?

What we find

Rooflights in a sheeted roof are panels of translucent plastic, usually glass-reinforced plastic or polycarbonate, that let daylight into the building. They are formed in the same profile as the sheets around them and fitted into the same line of laps. They are also the weakest part of the roof, in two senses.

For leaks, the usual culprits are old and dried-out sealant at the laps, split fixings, and sheets that have gone brittle after years of sun. Plastic rooflights yellow, craze and lose strength as ultraviolet light breaks them down. Sometimes the first sign is simply a patch of cracks. In a heavy rain the lap above a rooflight can drive water in underneath, so the leak appears at the rooflight even though the fault lies in the sheet above it.

For safety, a weathered rooflight cannot be trusted to carry a person. A rooflight can look like a solid, flat part of the roof and give way without warning, and it is one of the main causes of serious falls through roofs. Moss, paint and a grey film of dirt hide the difference between a rooflight and a sheet. Even a rooflight with a mesh beneath it should be treated as fragile unless it is known to be rated otherwise. The Work at Height Regulations 2005 apply to anyone who goes onto the roof, whether to repair it, clean it or fit a sign.

What we fix

Before anyone steps onto a roof, we plan the access. That means using platforms, crawling boards or a cherry picker from below rather than walking the roof where fragile sections are present, and fitting edge protection or covers over rooflights. Our guide to fragile roofs and rooflights and safe access on commercial buildings describes the precautions. If you commission any work that involves going on the roof, whoever is doing it should show you how they will reach it safely.

For the leak itself, a rooflight at the end of its life is replaced rather than patched. We match the profile of the surrounding sheets, fit the new panel with correct laps and sealant, and renew the fixings through it. Where the panels are cracked across the roof, replacing the lot with modern ones that carry a stated load rating, and fitting safety mesh below, gives you a safer roof as well as a dry one. Our answer on replacing rooflights on industrial roofs explains the detail. Under the Part L rules for non-domestic buildings, replacing rooflights can bring thermal performance into play, so we confirm with your building control body before ordering.

If condensation, rather than rain, is dripping from a rooflight in cold weather, the panel may be fine and the cure is ventilation or a double-skin unit.

Chapter 5: Why is the single-ply or felt roof on my shop or office block splitting at the seams and outlets?

What we find

Flat roofs on shops, offices, schools and small units are usually one of three things. A single-ply roof is a sheet of synthetic membrane, usually TPO or PVC, laid over insulation and joined at the seams by hot-air welding. A built-up felt roof is several layers of bitumen felt bonded together, usually with a mineral cap sheet on top. A liquid coating is a resin applied wet over an existing surface.

On single-ply, the usual trouble is at the details: the seam welds where a join was not fused properly, the corners and upstands where the sheet is folded and stressed, and the outlets, the drain points where water leaves the roof. A tear from a dropped tool or a fallen branch will do the same. On built-up felt, age is the enemy. The top layer cracks and loses its mineral grit, the laps open, and the layers beneath blister and let in water. In both, the root cause is often ponding: shallow standing water over months, which a flat roof laid without enough fall can never shed. If the insulation beneath has become wet, the roof loses its thermal performance and the weight of the water adds further load. The ceiling stain inside rarely sits below the opening, because water travels between the membrane and the insulation before it drops.

What we fix

Our survey starts with the drainage, because a roof that cannot shed water will fail again whatever we lay on it. We check the falls, the outlets and the upstands, and where we can we cut a small core to see whether the insulation underneath is wet. A dry core on a membrane with a few failed seams points to repair: we clean the surface, re-weld or patch the single-ply, or cut out and relay a section of felt with a proper overlap.

Where the insulation is saturated or the membrane has lost its bond across the roof, we strip back and relay. Fitting new insulation in tapered boards, which are cut with a slope built in, lets us correct the fall without rebuilding the structure beneath. Replacing a covering on a non-domestic roof is treated as renovating a thermal element, so Approved Document L, Volume 2, applies and we confirm the requirement with your building control body. Our guide to commercial roof replacement cost sets out what drives the price. Liquid coatings suit sound roofs that need extending in life, not failed ones.

The table gives the typical UK ranges reported for commercial flat roof work. They are reference figures, not Beacon prices.

Chapter 6: Why does water come into the building from the parapet or box gutter, not the main roof?

What we find

Many shops, offices and older industrial buildings have a gutter that is part of the building rather than hung from the edge. A parapet is a low wall that continues up past the edge of the roof. A box gutter is a channel set between two roof slopes or behind a parapet, lined in metal, asphalt or membrane. Both take the runoff from a large area of roof and funnel it to a few small outlets. They are the hardest-working parts of the building, and they do not forgive neglect.

The faults come in a predictable order. Leaves, silt and moss build up and block an outlet, and the gutter fills like a bath. A box gutter is built with a tight margin, so once water rises past the lining it spills over the top and runs down the inside of the wall, not away from it. Linings crack at the joints where metal has moved with the temperature. The pipes carrying water away fail at their joints and let it soak into the brickwork. On a parapet wall, the top coping stones or the flashing below them let go, and rain gets behind the lining. Because the water ends up inside the wall cavity or the structure below, the first sign can be damp on an internal wall some distance away.

What we fix

We begin with a clean. Clearing a blocked outlet and flushing the gutter shows whether the lining is sound or has failed underneath the debris. If the lining is cracked in a few places and the rest is firm, local repair is possible: patching the lining, resealing joints, and renewing a section of flashing at the coping. Where the whole lining has reached the end of its life, we strip and relay it. That might be in sheet metal, in a membrane or by lining the gutter with a liquid system, depending on the shape and what the gutter can carry. Our answer on gutter lining on a commercial roof explains where each suits.

The outlets deserve as much attention as the lining. If a gutter has one small outlet for a large roof area, adding a second, or an overflow set just below the level of the parapet, gives the water a safe place to go when the main outlet fails. An overflow also warns you early, because water shows on the outside of the wall before it spills inside. A short regular clean, ideally twice a year and after autumn leaf fall, prevents most of this.

Chapter 7: Can you replace the roof while the business stays open, and who pays under my lease?

What we find

The practical worry on most commercial jobs is not the roof itself but the disruption. A shop cannot close for three weeks. A food unit has to stay clean. A warehouse needs its loading bays clear and its racking dry. Occupiers also tend to ask a second question straight away: whose bill is this?

The answers depend on the building and the lease. Many commercial leases put the roof under the landlord's repair obligation, sometimes recovered through a service charge. Others make the tenant responsible for repair and the landlord for structure, or pass the whole building to the tenant on a full repairing lease. Which party arranges and pays for the work affects who we deal with, who gives access and who needs to approve the specification. We are roofers, not solicitors, and we do not give legal advice. Our answer on who repairs the roof, landlord or tenant sets out how these leases commonly divide it. Your solicitor or managing agent should read your lease before the work is ordered, since the answer is written there. A written survey with photographs and a fixed price helps either party see what is needed and what it costs.

What we fix

Work while a business is open is a matter of planning. We agree the sequence at the survey and in the quote. On a flat roof we normally work in sections, stripping and covering one area each day so that no more roof is open to the weather than we can close by evening. Overcladding suits an occupied building especially well, because the old roof stays in place beneath and the occupants stay dry throughout. Our answer on roof work while a business is trading covers the common arrangements.

Day to day, we agree where materials will be stored and where waste goes, keep delivery routes and fire exits clear, and set up exclusion zones below any area where we are working at height. Noisy work, such as stripping sheets, can be scheduled for quieter hours if the business needs it. Loading yards, car parks and public pavements below the work are protected, and we tell the occupiers what to expect each day.

If the roof is leaking and cannot wait, we prioritise it and make the area safe first, whether with a temporary cover, a cleared outlet or a repair in the dry. We cannot promise an arrival time, but we will tell you what is possible as soon as we know the building. At the end, the site is cleared and the waste is taken away.

When you get in touch, tell us what the building is used for, whether the roof is sheet, single-ply or felt, and whether a fixed ladder reaches it or access equipment is needed. That is enough to plan the survey around your trading hours. The survey settles the choice between repair, overlay and full replacement, and, if a lease is involved, shows who is likely to pay for which. Where the roof is replaced or overclad, our work is under a 10-year workmanship guarantee. Photos of the roof by WhatsApp, or a call to 01256 213956, will start the survey.

Commercial roofing guides and answers

Show all 32 guides and answers

Areas we cover

Our commercial roofing service covers Hampshire, Berkshire, Surrey and south Oxfordshire, up to 30 road miles from Basingstoke. These are the main towns and some of the villages we reach; each town page shows the roofs we meet there and the local planning picture.

All 123 towns and villages we cover

Commercial roofing: questions we get asked

Can a warehouse roof leak be fixed without stopping operations inside?

Often, yes. Most leaks on a sheeted roof are repaired from above, with access platforms and edge protection in place, so the floor below carries on. We agree the working area with you, protect racking and stock where water might drip, and re-seal laps or replace fixings in sections. Larger jobs, such as a new roof, are planned in phases. The photo report from the survey shows where the water is getting in before we start.

How do you survey a commercial roof you cannot safely walk on?

We plan access before going up. Where sheets or rooflights may be fragile, we work from platforms, crawling boards or a cherry picker, and avoid stepping on anything unproven. We also look inside the building at the underside of the roof for daylight, staining and corroded fixings. Photographs from both sides go into your report. Where a roof is too weak to walk on at all, the survey report records that and recommends how to inspect it.

Is overcladding allowed on my industrial unit, or do I need approval first?

It depends on the building and what the new roof adds. A new sheet system changes the weight on the structure and can change how the roof performs thermally, so it may need building control approval. We assess the existing frame at the survey and tell you what we find. Your building control body, either the council's team or a registered building control approver, confirms what applies, and we handle that side where the work is notifiable.

What happens if you find asbestos cement sheets during a repair?

We stop disturbing them. Asbestos cement is a known hazard once it is broken or drilled, so we plan around it before any sheet is touched. Depending on the roof, the options are to leave it and monitor, overclad it, or remove it under HSE rules with a risk assessment and controls. If the sheets will be substantially broken up, the work becomes notifiable. If other asbestos materials appear, the job is reassessed.

Can you quote for a landlord who manages several units on one estate?

Yes. We survey each unit separately and report on each roof with its own photographs, so the landlord or managing agent can see which units need repair and which have years left. You receive a fixed written quote per roof, or one combined quote if you prefer. Where a repair will hold we price it as a repair. Leases differ between units, so who pays is a question for your agent.

How often should a flat roof on a shop or office be checked?

At least once a year, and after any severe storm or a long period of heavy rain. A routine check clears outlets and gutters, looks at seams and upstands, and picks up small splits before they let water into the insulation. Autumn, after the leaves have come down, is a sensible time. We can survey on that rhythm and report with photographs, which also builds a record of the roof's condition over time.

Get your free roof survey

Tell us what’s happening and we’ll call you back to arrange a visit. You’ll get photos of your roof and a fixed written quote.

  • No obligation
  • Photo report of your roof
  • 10-year workmanship guarantee

Rather talk? 01256 213956

Call Free survey