Can a Flat Roof Be Fitted in Winter?

Cold weather rules out some flat roofing systems on some days, but it does not rule out the season. What matters is whether the deck is dry and which covering suits the forecast.

4 min read

The short answer

Yes, a flat roof can be fitted in winter, provided the deck is dry and the covering chosen suits the conditions. Rubber (EPDM) sheet is the most forgiving in the cold. Torch-on felt and fibreglass (GRP) laminate are more fussy, because bitumen bonds poorly to a wet surface and resin cures slowly in cold, damp air. A good roofer works around the forecast, protects the open roof each evening, and will not lay a covering over a wet deck.

What winter changes on a flat roof job

A flat roof is only open to the weather while the old covering is off and the new one is not yet sealed. The risk in winter is not the cold itself. It is moisture. Timber that is damp when it is covered stays damp, and a membrane laid over it traps that water against the deck, where it can rot the boards and joists from above. So the first test on any cold-season job is how wet the deck is, not how low the thermometer reads.

Short daylight is the second factor. A crew has fewer hours to strip, dry, lay and seal, so the work is planned in smaller sections, each one made watertight before everyone leaves. On a small extension roof that is easy to do. On a long roof it means taking more care over how the job is phased.

How each covering copes

EPDM is a rubber sheet that is bonded down with adhesive or laid loose and ballasted. It stays flexible in low temperatures and goes down in one large piece, so there are few seams to cure. Adhesive still needs a dry, clean surface, and some adhesives are fussy about cold, so installers pick a product suited to the day. This is why rubber is the first system we reach for when the forecast is poor.

Torch-on felt is melted onto the deck with a gas torch. Cold slows the work and a damp deck prevents a good bond, so it is laid only on dry days. GRP is liquid resin that is brushed onto glass matting and left to harden. Low temperatures and high humidity slow the cure, and a resin that has not hardened properly can stay weak and tacky. Cold nights also mean condensation can settle on the surface before it sets. Our page on EPDM, GRP and felt compared sets the three materials side by side, and liquid roofing covers the coating option.

What a roofer checks before opening the roof

Before any covering comes off, we look at the weather for the days ahead, not just the morning. A settled spell is better than a clear day sandwiched between storms. We prepare enough dry insulation and boards to close up the same day, we keep tarpaulins and temporary sheeting on site, and we plan the strip so that the part we open can be sealed before dusk.

If frost is lying on the deck, it has to go before anything is bonded. Frost melts into water, and a sheet laid over it simply seals that water in. Insulation boards must be dry when they are fitted too, which is why a roof in a wet week is often better left alone until conditions improve than hurried. Boards stored on site are kept covered and off the ground for the same reason, since a pack that has sat in a puddle overnight is no use on a roof.

When it is wiser to wait

Some jobs are better held over. A roof that is already leaking should be made safe at once, and we do that first with a temporary repair, but a full replacement over a saturated deck gains nothing by being rushed. Sustained rain, fog that keeps surfaces wet, and a hard frost that persists through the day are all reasons to postpone and re-book.

A short delay costs very little compared with a covering that blisters or fails to bond, and it is a decision we make together with you, not one we make quietly. Our guide on the best time of year for roof work weighs the seasons against one another, and the article on how long a flat roof takes to replace shows what the programme usually involves.

How we handle it

The free survey comes with photographs of your own deck, so you can judge its condition for yourself, and a fixed written quote follows. If the deck is dry and sound we say so, and if we think a repair is enough we say that too. A winter start is agreed with you around the forecast rather than fixed to a date that the weather may overrule. Every finished roof carries our 10-year workmanship guarantee in writing, and the site is cleared and the waste taken away. For the wider picture on materials and cost, see flat roofing in Basingstoke.

Every roof is different. A free survey with photos settles it for yours.

Get a free survey

Related questions

Will a flat roof laid in cold weather be weaker than one laid in summer?

Not if the conditions on the day were right. The bond, the cure and the dryness of the deck matter more than the date. A covering that went down on a dry deck with a suitable system performs the same whatever the season. The roofs that fail are the ones laid over damp boards or in resin that never cured, and we avoid both.

What happens if rain stops work halfway through my roof?

The section that is open gets sealed or sheeted over before the crew leaves, so the house stays dry overnight. Work resumes when the deck has dried. We would rather lose a day than lay a membrane over wet timber, and we tell you when a delay is coming. Your fixed quote follows the survey and does not change because the weather did.

Get your free roof survey

Tell us what’s happening and we’ll call you back to arrange a visit. You’ll get photos of your roof and a fixed written quote.

  • No obligation
  • Photo report of your roof
  • 10-year workmanship guarantee

Rather talk? 01256 213956

Call Free survey